Fed Ex Freight Facility

Fed Ex Freight Facility

Topeka, KS

This project consists of 430,000 SF of site paving and a 33,000-SF cross dock service center that contains single-story office space. The exterior facade consists of concrete tilt-wall panels. Other elements on the site include a detached fuel facility, security building, and large quantity of vehicle block warming/Future EV charging stations, and site lighting to support 24-hr operations.

Project Spotlight:

  • Design-Build/Design-Assist and Value-
  • Engineering to support more efficient design and construction.
  • Significant site underground layout via BIM coordination.
  • • Battery charging stations for material handling
  • 100% building backup power for 24-hr operation.
  • Dock-leveling with backup/anchoring systems.
  • Lightning Protection Systems.