This project consists of 430,000 SF of site paving and a 33,000-SF cross dock service center that contains single-story office space. The exterior facade consists of concrete tilt-wall panels. Other elements on the site include a detached fuel facility, security building, and large quantity of vehicle block warming/Future EV charging stations, and site lighting to support 24-hr operations.
Project Spotlight:
- Design-Build/Design-Assist and Value-
 - Engineering to support more efficient design and construction.
 - Significant site underground layout via BIM coordination.
 - • Battery charging stations for material handling
 - 100% building backup power for 24-hr operation.
 - Dock-leveling with backup/anchoring systems.
 - Lightning Protection Systems.
 
								